30.10.2026

VERTI-GO has reached a key engineering design milestone: Demonstrator design and performance simulation

VERTI-GO has reached a key engineering design milestone: Demonstrator design and performance simulation

During the first year of VERTI-GO, the project has reached an important milestone with the finalisation of the basic engineering design. The work has included coupled simulations covering wind, waves, turbine dynamics, flexible components, moorings and control systems, using DeepLinesWind, as well as Sowento’s SLOW+ software. They provide the basis for the design of the performance of the 2 MW VAWT demonstrator. 

The technical coordinator SeaTwirl led the work of this milestone, which has been carried out in the D2.1 deliverable, focusing on the basic engineering design. This deliverable consolidates the engineering work carried out during the initial design phase and establishes the technical baseline for the VERTI-GO concept. Through a comprehensive set of engineering drawings, the main design features, configurations, and interfaces have been defined, effectively freezing the concept at the basic engineering level. 

The completion of this deliverable marks a significant step forward for the project, providing a common technical reference for the consortium and a solid foundation for the next phases of engineering and development. It also reflects the progress made in translating the VERTI-GO concept into a defined engineering solution and brings the project one step closer to deployment.

Get in touch with us

Our mailboxes are always happy to receive enquiries and synergies proposals.

contact us

Newsletter

Subscribe to receive the VERTI-GO newsletter with latest news and events.

subscribe